Main news
All news
- Details
Currently, the specialists are concreting the foundation slab of the reactor building and erecting the walls of the turbine building.
- Details
This is a welded metalwork that consists of 24 sections – two separate tiers with 12 sections each.
- Details
The concreting volume comprises about 2.5 thousand cubic meters and the overall weight of slab is about seven thousand tons.
- Details
These are the support truss, the thrust truss, the reactor dry containment, and the heat insulation of the reactor pressure vessel cylindrical part.
- Details
They are busy with construction of facilities of turbine islands in two power units and the evaporative cooling tower of power unit 2.
- Details
Specialists from SMU 1, SMU 2, and the Energy Supply Department are now working at the construction site.
- Details
This work has been performed by specialists of TİTAN2 IC İÇTAŞ İNŞAAT ANONİM ŞİRKETİ, a Russian and Turkish joint venture. The whole structure was handled and installed with the help of Liebherr LR 13000 heavy-duty crawler crane.
- Details
These systems immediately respond to any leaks of oil products, shut gate valves and, thus, prevent spills.
- Details
The photographer is Aleksandr Kashin, Deputy Head of CONCERN TITAN 2 Media Centre.