JSC MSU-90 (TITAN-2 Holding) team is working with the equipment. The first of the four electric motors has been moved to the reactor building.

The electric motor weighs 46 tons. Pre-assembly of the equipment was carried out on the construction base. Each electric motor passed high-voltage tests. Electric motors are delivered to the construction site by road. Liebherr LR 11352 crawler crane then moves the load to the reactor compartment through the equipment lock trestle. A polar crane lowers the electric motors to the design location (+14,000 elevation).

The electric motors of the reactor coolant pumps are designed to create coolant circulation in the primary circuit and heat removal from the reactor core. Three more equipment items will be soon delivered to the reactor building.

Note:

Titan-2 Holding is the largest in the North-West group of companies, constructing the most important nuclear industry and power facilities. The company performs a full range of construction and installation works from engineering to commissioning.

Titan-2 Holding is the general contractor for the construction of the Leningrad NPP-2 power units. The Holding Companies perform all the civil, installation, and electrical works at a construction site. The works are carried out in the reactor, turbine, power supply, water supply, heat cogeneration buildings and other power unit structures.