It is used to construct the 170 meter high evaporative cooling tower.

It is used to construct the 170 meter high evaporative cooling tower.

The works at the facility are carried out by the Northern Construction Department team. The telescoping operation is installation of additional crane sections to increase the lifting height. To date, the crane is 118 meters high.

In the near future, installation of crane pillar anchoring will be started with guy ropes to the cooling tower foundation using the second-level frame. Guy ropes are anchored to the frame and then the ropes will be tightened using a special jack.

Note:

Titan-2 Holding is the largest in the North-West group of companies, constructing the most important nuclear industry and power facilities. The company performs a full range of construction and installation works from engineering to commissioning.

Titan-2 Holding is the general contractor for the construction of the Leningrad NPP-2 power units. The Holding Companies perform all the civil, installation, and electrical works at a construction site. The works are carried out in the reactor, turbine, power supply, water supply, heat cogeneration buildings and other power unit structures.