LOT NO.         NAME OF PROCUREMENT PROCEDURE SCHEDULED STARTING DATE
101 Independent NDT&DT Laboratory Services at the "Hanhikivi-1" NPP site 4th quarter 2017
112 Execution  of CIW  for NI levelling concrete  4th quarter 2017
107 Execution  of CIW  for vertical levelling and for construction of I-st phase of  storage facilities 4th quarter 2017
106 Execution  of CIW for construction of the Contractor’s working shops 4th quarter 2017
70 Reinforcement of ground slabs 10UJA 10UJE 4th quarter 2017
71 Installation of pipelines and drains of the foul water system after fire extinction (GML) at the buildings 10UJA 10UJE 4th quarter 2017
109 Development of DD for levelling concrete of main buildings and structures of TI 4th quarter 2017
108 Development  of DD for Turbine hall, 2-nd phase 4th quarter 2017
131 Rock soil excavation for surge pool 10 UQJ and distribution basin 10UPU 4th quarter 2017
135 Buildings and structures operation and maintenance at the territory of Hanhikivi 1 construction site 4th quarter 2017
137 Arrangement of Gatehouses 93UYF, 94UYF, 95UYF at the construction and installation base 4th quarter 2017
147 Arrangement of asphalt concrete pavement for parking lot and adjacent territory of Gatehouses 91UYF and 92UYF 4th quarter 2017
148 Construction  of buildings for reinforcement production, interior finishing works, installation of utility networks and installation of equipment 4th quarter 2017
96 Construction of standby water outlet structure 10UQU at the aquatorium of Hanhikivi-1 NPP 1st quarter 2018
72 Installation of ICPS anchor castings at the building 10UJA 1st quarter 2018